St Canute from 25 August 2026
25 August 2026 – Kit opened and checked Full scale plans Small items Laser cut parts Laser cut parts Instructions Corrections Sails and flags Box
25 August 2026 – Kit opened and checked Full scale plans Small items Laser cut parts Laser cut parts Instructions Corrections Sails and flags Box
23 August 2026 – Ratlines added to topmast shrouds 22 August 2026 – Anchors assembled and painted 12 July 2026 – Masts seated onto hull 12 July 2026 – Shrouds completed and chains rigged 10 July 2026 – Mainmast yards and gaff roughed 10 July 2026 – Foremast yards roughed …
18 June 2026 Boat 4 rigged aft 18 June 2026 Boats 3,4 completed. 17 June 2026 Boats 3,4 completed. Fittings prepared 17 June 2026 Boat 4 plank 1 17 June 2026 Boat 3 hull covering 15 June 2026 Boat 2 fitting out completed 14 June 2026 Boat 2 frames covered. …
Earliest Times Early ships whether for passengers or cargo were generally flat bottomed and would be ‘beached’ to unload and load. Loading was done by hand, limiting what could be carried aboard. Ships could be specially built to carry heavier loads, for example, large carved stones for stone circles – …
The Docks were built on the corner of the Wirral where the River Birket cut off the corner and flowed into Bidston Moss which was the boggy area separating the various stretches of high ground – Wallasey, Bidston, Caldy, Heswall etc. It enable docks to be constructed with a minimal …
Draw 1: Aircraft Carriers from Seaplane carriers During WW2 it was essential to supply air cover for convoys and for amphibious landings and smaller ‘escort carriers’ were built in huge numbers to cover this deficiency. The US Commencement Bay class was one of the most numerous and were active as …
HMS Beagle hull construction 3 May 2026 Beakhead completed, painted 3 May2026 After fittings completed, varnished 7 March 2026 Guwhales added, trim for masts added 7 March 2026 White hull stripe painted, stern lights added 6 March 2026 Parts for upper deck prepared painted 6 March 2026 Upper hull painted …
27 November 2025 Liver building fitted out and completed 27 November 2025 Balustrade paper created and balustrades covered 27 November 2025 Roof tile paper created and fitted 26 November 2025 Surround walls fitted 26 November 2025 Roof base 26 November 2025 Entrances added 23 November 2025 26 November …
10 November 2025: Group 435 – Popovka, Nissos Rhenia 8 November 2025: Group 434 – Atlantic Sail, Mazarine 5 November 2025: Group 433 – Alaunia, Tuscania 31 October 2025: Group 432 – Albania, Lancastria 28 October 2025: Group 431 – Costa Toscana, Media 24 October 2025: Group 430 – …
8 May 2025 Adler completed 8 May 2025 Tender completed 8 May 2025 Tender painted 6 May 2025 Tender wheel and axle assemblies prepared 6 May 2025 Tender undercarrige fitted with couplings 4 May 2025 Tender coachwork completed 3 May 2025 Tender undercarriage frame fitted, glued 3 May 2025 …