Construction from Billings kit to December 2016
| 06-Dec-16 | Plank -3 glued in place – stb’d – lower main |
| Plank -3 glued in place – port – lower main | |
| Planks -3 P&S rough cut to length | |
![]() |
|
| 02-Dec-16 | Plank -1 glued in place – Stb’d – lower main |
| 01-Dec-16 | Plank 0 glued in place – Stb’d – lower main |
| 28-Nov-16 | Plank -1 glued in place – Port – lower main |
| 27-Nov-16 | Plank -1 end glued in place – Port – lower main |
![]() |
|
![]() |
|
| 26-Nov-16 | Plank 0 glued in place – Port – lower main |
| Quarterdeck and poopdeck | ![]() |
| Bending the planks after boiling | ![]() |
| View on 23rd Nov 2016 | ![]() |
| View on 23rd Nov 2016 | ![]() |
| 23-Nov-16 | Planks bent for shaped stern |
| 16-Nov-16 | Planks aft re-glued formin stern. |
| Planks bent after heating in water as preliminary to gluing. | |
| 15-Nov-16 | Planks extended, glued P & S, sides reglued, clamped |
| Ribs at bow shaped to take planks | |
| Construction on 9th May 2015 | ![]() |
| Construction on 9th May 2015 | ![]() |
| Construction on 9th May 2015 | ![]() |
| Construction on 9th May 2015 | ![]() |
| 09-May-15 | Planks aft P-3, P-4 glued, S-4 glued. P-5 cut, glued. P-6 glued. Fore P,S-6 |
| shaped, glued. P-7 glued. P-8 glued. P-9 to P-10 cut & glued. P-11 cut. | |
| P-11 & S-11 cut, shaped, glued. P & S-12 cut, glued. After plate trimmed. | |
| Sides trimmed, smoothed. P7, & S7 shaped in situe. | |
| 08-May-15 | Planks S-2 to -4 glued, Planks P-2, P-3 glued. Aft P-3, -4 cut, positioned |
| 07-May-15 | Focs’l planks P-2 to P-3, S-2 to S-4 bent again |
| 06-May-15 | Glued plank P-1 |
| 05-May-15 | Fore, aft plank P0, bent, glued. P-1 & foc’sl planks P-2 to P-4, S-3 to S-4 bent |
| 04-May-15 | Aftercastle plank S0, fo’cs’l plank S0. Full length plank S-1, aft S-2, S-3 |
| Aft S-4, S-5, S-6, S-7 to S-11 | |
| 03-May-15 | Planks S5 to S7, P5 to P7 glued |
| 02-May-15 | Planks P1 to P4, S1 to S4 glued – 4P & 4S steamed bent |
| 01-May-15 | Planks 4P & 4S steamed bent |
| 28-Sep-13 | Stern hull planking |
| 24-Sep-13 | Preparation |
| 12-Jul-13 | After ribs |
| 25-Jun-13 | Sort strips of wood |
| 18-Jun-13 | After end |
| 17-Jun-13 | Stand, After castle |
| 15-Jun-13 | Bow, beak frames |
| 13-Jun-13 | Ribs 1 to 9 sorted & glued, focs’l, main, q’decks, poop. Parts cut out |
| 11-Jun-13 | Ribs sorted, numbered |
| 10-Jun-13 | Keel assembled |








