Pond yacht Eve – fron 6th November 2019

Initial strip down 6th November 2019

 

Plans taken from original yacht

The yacht deck was delaminating, the sails and screw eyesneeded renewing,  mast and boom s were just about OK and halyard, shrouds and stays needed renewing with thinner strong thread and shortening tack needed remaking to a smaller size. The hull had been blown apart by the foam inside. Foan needed removing and hull regluing.