Henrietta-Maria
16 December 2022 – Rigging completed. Flag added
16 December 2022 – Mains’l, tops’l, stays’l and jib rigged
15 December 2022 – Gaffs attached to mains’l. Tops’l spar, stays’l and jib sheets rigged
14 December 2022 – Shrouds made up and fitted to hull: 1. Shrouds prepared. 2. Used needle threader to thread thread through deadeye. 3. Used threader to thread thread through all 6 holes in deadeyes. 4. Finished off with 3 half hitches and a drop of glue on the knots. 5. Assembly of shroud pinned port & starboard to hull on rubbing strake.
1.
2.
3.
4.
5.
6.
12 December 2022 – Sails edged and finished
11 December 2022 – Sails rough cut
11 December 2022 – Companionway and hatch covers added, glued
11 December 2022 – Deck fittings added, glued
10 December 2022 – Mainmast and topmast fitted. Gaffs fitted.
10 December 2022 – Rudder fitted, painted. Bowsprit fitted to hull on stantion with winch
9 December 2022 – White stripes above boot topping and rubbing strake painted
9 December 2022 – Hull above and below rubbing strake painted light blue
9 December 2022 – Hull boot topping & rubbing strake painted red
4 December 2022 – Hull filled, sanded, prepared for painting, rubbing strake glued
3 December 2022 – Gunwhales glued, rubbing strakes bent
1 December 2022 – Hull planks starboard, bent in situe, glued
30 November 2022 – Hull planks 9,10,11 P&S bent in situe, glued
28 November 2022 – Hull planks 8 P&S bent in situe, glued
28 November 2022 – Hull planks 5,6,7 P&S bent in situe, glued
27 November 2022 – Hull planks 4 P&S glued.
27 November 2022 – Hull planks 3 glued. Planks 4 bent in situe
27 November 2022 – Hull planks 3 bent in situe
27 November 2022 – Hull planks 2 bent in situe, glued
26 November 2022 – Hull planks -3 bent in situe, glued
25 November 2022 – Hull planks 0,1 glued, planks -1,-2 bent in situe
24 November 2022 – Hull planks 0,1 bent in situe
21 November 2022 – Decking shaped and glued
20 November 2022 – Stern plate fitted, glued
20 November 2022 – Hull frames glued to keel and decks dry fitted to shape and space
19 November 2022 – Hull frames, keel and decks cut out
19 November 2022 – Instructions and kit parts checked.