Prinz Eugen – Fitting out
9 October 2024 Lifeboats fitted, screws fitted
7 October 2024 Bridge structure, fittings
7 October 2024 After superstructure, radar
4 October 2024 Aircraft, spare float, lifefloats, small AA fitted
2 October 2024 Lifeboats 2 to 4 painted
1 October 2024 Lifeboats 2 to 4 fitted with railings
1 October 2024 Lifeboats 2 to 4 fitted with rudders
29 September 2024 Lifeboats 1 completed, painted
27 September 2024 Lifeboats 2,3,4 prepared
25 September 2024 Lifeboat 1 prepared, painted
24 September 2024 Turrets A, B, X and Y completed, fitted
20 September 2024 Turrets B and X completed
23 September 2024 Turrets A and Y completed
22 September 2024 Casings on ‘A’ and ‘Y’ glued
22 September 2024 Main armament turret frames constructed
22 September 2024 Radar array and fittings aft
20 September 2024 Fore and aft deck fittings
20 September 2024 Cranes and lifebelts fitted
20 September 2024 Main armament deck rings, lifebelts painted
20 September 2024 Cranes painting, construction completed
18 September 2024 Crane jib and base completed
17 September 2024 Floats, hose reels completed
15 September 2024 Foredeck fittings added
13 September 2024 Anchors and chains fitted fore and aft
11 September 2024 Main and foremasts, tower top, ladders, torpedo tubes and frames
9 September 2024 Main mast completed
9 September 2024 Deck fittings completed
8 September 2024 AA guns,capstans and other fittings completed
9 September 2024 After structure sections added
7 September 2024 AA, Screws, spotlights and anchors painted
7 September 2024 Secondary armament painted with dazzle paint
5 September 2024 Bridge and fittings added
4 September 2024 Fittings painted
3 September 2024 Fittings completed
2 September 2024 Fittings prepared
1 September 2024 Secondary armament and torpedo tubes assembled, completed
1 September 2024 Secondary armament prepared
30 August 2024 Superstructure and funnel assembly glued