Prinz Eugen – Superstructure
30 August 2024 Superstructure and funnel assembly glued
29 August 2024 Vents and ladders fitted to superstructure
29 August 2024 Structure aft of funnel fitted
28 August 2024 Funnel fittings painted
28 August 2024 Superstructure completed and dry assembled
28 August 2024 Funnel fittings added
27 August 2024 Side frames glued and painted
25 August 2024 Side frames completed
24 August 2024 Side frames on after superstructure constructed
22 August 2024 Superstructure dazzle paint added
5 August 2024 Three sets of steps assembled
5 August 2024 Aircraft completed and boat frames assembled
3 August 2024 Funnel assembly and fittings painted
2 August 2024 Funnel assembled and fittings added
1 August 2024 Funnel, funnel cap and fittings prepared
1 August 2024 Funnel basic construction
1 August 2024 Superstructure components prepared
30 July 2024 Bridge unit completed with metal sheathing
29 July 2024 Upper superstructure aft completed
29 July 2024 Upper superstructure completed
28 July 2024 Upper superstructure metal sides completed
28 July 2024 Upper superstructure metal sides, lower row completed
26 July 2024 For’ard section of superstructure metal sides added and completed
26 July 2024 Sides of for’ard structure prepared
25 July 2024 Page ‘V’ structures completed
24 July 2024 Superstructure components assembled from page ‘V’
24 July 2024 Superstructure components assembled from page ‘U’
22 July 2024 Metal sides of superstructure component B7 prepared
12 July 2024 Decks added to U substructures
12 July 2024 U1 to U23 substructures prepsred
12 July 2024 Fourth substructure T2 to T8 and remaining third structure T1 assembled
12 July 2024 Third substructure S22 to S32 assembled
12 July 2024 Substructures assembled
11 July 2024 Superstructure sub structure cut out
11 July 2024 Upper decking completed with holes cut
11 July 2024 Upper decking completed with planks trimmed
10 July 2024 Upper decks R1 and R3 to R8 prepared
10 July 2024 Deck planking completed, trimmed and holes cut
10 July 2024 Decks Q1 and Q3 completed rough cut
10 July 2024 Superstructure decks Q1 and Q3 and decking begun