German Heavy Cruiser Prinz Eugen superstructure from 10 July 2024

Prinz Eugen – Superstructure

30 August 2024 Superstructure and funnel assembly glued

   

29 August 2024 Vents and ladders fitted to superstructure

29 August 2024 Structure aft of funnel fitted

 

28 August 2024 Funnel fittings painted

   

28 August 2024 Superstructure completed and dry assembled

28 August 2024 Funnel fittings added

     

 

27 August 2024 Side frames glued and painted

25 August 2024 Side frames completed

 

24 August 2024 Side frames on after superstructure constructed

22 August 2024 Superstructure dazzle paint added

5 August 2024 Three sets of steps assembled

5 August 2024 Aircraft completed and boat frames assembled

3 August 2024 Funnel assembly and fittings painted

2 August 2024 Funnel assembled and fittings added

 

1 August 2024 Funnel, funnel cap and fittings prepared

1 August 2024 Funnel basic construction

   

1 August 2024 Superstructure components prepared

30 July 2024 Bridge unit completed with metal sheathing

   

29 July 2024 Upper superstructure aft completed

29 July 2024 Upper superstructure completed

28 July 2024 Upper superstructure metal sides completed

28 July 2024 Upper superstructure metal sides, lower row completed

26 July 2024 For’ard section of superstructure metal sides added and completed

26 July 2024 Sides of for’ard structure prepared

25 July 2024 Page ‘V’ structures completed

  

24 July 2024 Superstructure components assembled from page ‘V’

24 July 2024 Superstructure components assembled from page ‘U’

22 July 2024 Metal sides of superstructure component B7 prepared

12 July 2024 Decks added to U substructures

12 July 2024 U1 to U23 substructures prepsred

12 July 2024 Fourth substructure T2 to T8 and remaining third structure T1 assembled

 

 

12 July 2024 Third substructure S22 to S32 assembled

12 July 2024 Substructures assembled

11 July 2024 Superstructure sub structure cut out

11 July 2024 Upper decking completed with holes cut

11 July 2024 Upper decking completed with planks trimmed 

10 July 2024 Upper decks R1 and R3 to R8 prepared

   

10 July 2024 Deck planking completed, trimmed and holes cut

10 July 2024 Decks Q1 and Q3 completed rough cut

10 July 2024 Superstructure decks Q1 and Q3 and decking begun