Bounty Jolly Boat
28 February 2023 Model completed
21 February 2023 Mains’l and jib rigged. Fittings added
14 February 2023 Bowsprit, fore stays’l and shrouds
25 January 2023 Shrouds completed
18 January 2023 Halyards, sheets attached to stays’l and jib
17 January 2023 Halyard rings sewn onto stays’l and jib (Ilona Palotas and Ferenc Berezvai working on sails)
21 December 2022 Mains’l sewn onto lower tops’l gaff and mounted on mainmast
21 December 2022 Rings sewn and glued onto mains’l
8 December 2022 Rudder pintles cut, shaped, fitted. Rudder fitted
7 December 2022 Mast support fittings made and fitted
7 December 2022 Rowlocks cut and strips glued. Hull painted, smoothed
5 December 2022 Rowlock strips bent in situe
4 December 2022 Hull filled, prepared for painting
18 November 2022 Mast, bowsprit and gaffs prepared
17 November 2022 Gunwhale planks bent
15 November 2022 Keel fitted, glued
15 November 2022 Hull planks fitted and completed. Keel, rudder prepared
11 November 2022 Starboard side planks fitted and completed
3 November 2022 5 oar shafts shaped, blades glued
1 November 2022 Planks completed to top of ribs and trimmed
1 November 2022 3 oar shafts shaped, blades glued
30 October 2022 Planks 5,6, port fitted, bent, glued
29 October 2022 Planks 2,3,4 port fitted, bent, glued
27 October 2022 Plank 1 port fitted, bent, glued
2 October 2022 Planks 3 to 7 starboard bent, glued
20 September 2022 Plank 2 starboard bent, glued
13 September 2022 Plank 1 starboard bent, glued, pinned
06 September 2022 Two planks bent in preparation for planking on frames
06 September 2022 Bottom boards and thwarts glued in place
24 August 2022 Bottom boards and thwarts cut
17 August 2022 Prow & Afterboards varnished, glued. Prow shaped
15 August 2022 Frames glued to keel
7 August 2022 Frames assembled dry
7 August 2022 Parts cut out from laser sheets
7 August 2022 Kit parts checked out