30 April 2025 Chassis painted

30 April 2025 Boiler and steam box fittings added

27 April 2025 Chassis fitted to boiler assembly

26 April 2025 Chassis side assembled

26 April 2025 Parts of chassis side prepared

26 April 2025 Wheels assembled on chassis

26 April 2025 Secondary wheels painted and assembled

25 April 2025 Secondary wheels prepared for assembly

25 April 2025 Main wheels attached to axles on chassis

25 April 2025 Main wheels assembled and glued

25 April 2025 Main wheels painted

24 April 2025 Main wheels prepared
24 April 2025 Drive train completed

23 April 2025 Firebox, Steam chest and boiler assembled with gear mechanism
23 April 2025 Firebox and Steam chest assemblies painted

21 April 2025 Steam chest outer assembled and completed


20 April 2025 Steam chest inner constructed


20 April 2025 Firebox boiler end completed

20 April 2025 Firebox boiler end inner assembled and outer prepared

20 April 2025 Boiler painted green and brass bands added. Supports painted metallic steel


20 April 2025 Boiler completed and sanded

20 April 2025 Axle supports added

20 April 2025 Boiler frame assembled


19 April 2025 Adler kit contents