27 November 2025 Liver building fitted out and completed

27 November 2025 Balustrade paper created and balustrades covered


27 November 2025 Roof tile paper created and fitted


26 November 2025 Surround walls fitted

26 November 2025 Roof base
26 November 2025 Entrances added

23 November 2025

26 November 2025 Two towers glued

26 November 2025 Two towers completed and dry fitted


23 November 2025 Towers internal structures built

23 November 2025 Tower structures dry fitted

23 November 2025 Tower structures roughed


23 November 2025 Windows and doors printed and added to base


22 November 2025 Buiding doors and windows printed and added



22 November 2025 – Model glued
22 November 2025 – Model dry with central columns assembled
22 November 2025 – Columns glued to main base. Base reinforced with balsa wood

22 November 2025 – Central columns created in card and covered with printed patterns


21 November 2025 – From photos, using paint, windows and doors selected, sized and printed in quantity

21 November 2025 – Card walls cut out to plan size. Central pillars created


21 November 2025 – Roof plan printed and cut out then backed onto card. Base plan cut to the same pattern



21 November 2025 – photos analysed and plan printed



