HMS Beagle hull fitting out from 3 May 2026

18 June 2026 Boat 4 rigged aft

18 June 2026 Boats 3,4 completed. 

17 June 2026 Boats 3,4 completed. Fittings prepared

17 June 2026 Boat 4 plank 1

17 June 2026 Boat 3 hull covering

15 June 2026 Boat 2 fitting out completed

14 June 2026 Boat 2 frames covered. Hull completed. Keel and rudder added

13 June 2026 Boat secured to deck with tackles

13 June 2026 Beakhead chains and figurehead

12 June 2026 Boat fittings and rudder chains added

7 June 2026 Boat 1 completed

7 June 2026 Boat 1 hull painted, accessories prepared

6 June 2026 Boat 1 hull filled

6 June 2026 Planking completed on boat 1

5 June 2026 Planks 4,5 added to boat 1

3 June 2026 Planks 1,2 added to boat 1

31 May 2026 Boat racks completed

31 May 2026 Deck houses completed

29 May 2026 Boats 1 to 4 components cut out

29 May 2026 Boats 2,3,4 frames assembled

29 May 2026 Boats 2,3,4 frames cut out

 

28 May 2026 Boat1 frames assembled

28 May 2026 Deck house bases cut, assembled

26 May 2026 Main deck fittings, cannon, pumps

20 May 2026 Ladders, railings on main deck added

17 May 2026 Fittings added to quarter deck

16 May 2026 Belaying pin racks on main deck drilled, glued

16 May 2026 Deck fittings on focs’l

13 May 2026 Deck fittings, wheel, windlass, barbette, racks, ladders

 

6 May 2026 Chain plates port and starboard glued

4 May 2026 Chain plates, deadeyes, pulleys and fittings prepared

3 May 2026 Chains created and drilled. Deadeyes wired.