Wasa (Vasa) – Hull construction from 20 November 2020

Wasa (Vasa) Hull construction

28 November 2020  Frame 9 rtrimmed, positioned, squared, fitted on keel

27 November 2020  Frames 13 down to 4 marked on main deck former

27 November 2020  For’ard frame 13 and parts 16 x 2 and 17 x 2 dry assembled

   

24 November 2020  After frame 1 and additions dry assembled

   

23 November 2020 Keel assembled, glued

20 November 2020 Main frames 1 to 13 cut out

20 November 2020 Keel cut, bow and stern assembled and reinforcements all dry assembled