Iron Battle Ship “Warrior 1860” hull construction from 30 November 2023

 Warrior

18 March 2024 Gunport covers and net stretchers added

17 March 2024 Wire for davits bent

17 March 2024 Anchors painted

   

17 March 2024 Cannons C1 to C4 fitted on main deck

17 March 2024 Cannons C4 after construction

16 March 2024 Cannons C1 added to after deck after construction

15 March 2024 Rudder added. Rear cabin window decoration added with name plate

 

14 March 2024 Uptakes added aft of funnels and bridges completed and added

 

13 March 2024 For’ard bridge completed ready for painting

12 March 2024 After gun tracks added. Main belaying pin racks completed

 

11 March 2024 For’ard gun tracks added. Belaying pin racks & stairs completed

9 March 2024 Gratings painted, glued. Funnels, vents repainted

   

9 March 2024 Gratings painted, glued. Funnels, vents repainted

7 March 2024 Deckhouses and funnels prepared, fry fitted

5 March 2024 Capstan constructed and fitted. Wheel units constructed

 

4 March 2024 Ventilator asemblies completed, dry fitted

1 March 2024 White stripe added (glued paper)

29 February 2024 Port side painted black

 

29 February 2024 Starboard side painted black

28 February 2024 Gunwhale channel painted white

27 February 2024 Gunwhale channel completed over chains

26 February 2024 Chains port and starboard fitted

 

25 February 2024 Mizzen chains starboard fitted

24 February 2024 Beakhead railings soldered, fitted

23 February 2024 Beakhead and grating completed

23 February 2024 Gunwhale struts added

22 February 2024 Gunwhale tops and ports continued

21 February 2024 Gunwhale lower trims and links added

   

19 February 2024 Gunwhale tops painted white, lower covers painted black

19 February 2024 Inside of gunwhales painted white

17 February 2024 Figurehead painted

   

17 February 2024 Deckhouse painted white and other parts painted

17 February 2024 Deckhouse glued, lined, varnished

16 February 2024 Section of deck fittings prepared

16 February 2024 Gunwhale tops prepared

16 February 2024 Belaying pin racks and cat heads fitted

11 February 2024 Gratings varnished

11 February 2024 Chain plated fore, main, mizzen added

7 February 2024 Decking completed

6 February 2024 Decking started

 

4 February 2024 Parts 120 inserted in decks

 

3 February 2024 Hull red stripe starboard painted

2 February 2024 Hull red stripe port painted

 

1 February 2024 Screw painted

1 February 2024 Hull black lower half port painted

31 January 2024 Hull black lower half starboard painted

 

29 January 2024 Hull sanded, filled, completed, marked for painting

27 January 2024 Hull sanded, filled

24 January 2024 Gunwhales reinforced and tidied

14 January 2024 After end completed

 

13 January 2024 After end prepared for hull completion

10 January 2024 Starboard side completed

7 January 2024 Starboard side infill below plank 10 begun

6 January 2024 Starboard side planks 5 to 9 added

5 January 2024 Starboard side planks 1 to 4 added

18 December 2023 Starboard side planking begun

     

17 December 2023 Port side planking completed

16 December 2023 Planks 8 to 14, port side added

14 December 2023 Planks 1 to 7, port side added

11 December 2023 After structure completed. Screw constructed

 

9 December 2023 After structure added

6 December 2023 Sides sheets completed

3 December Upper side glued

4 December 2023 Upper sides sheets bent

3 December 2023 Main deck glued

1 December 2023 Struts in bow section added

1 December 2023 Small decks added fore and aft

30 November 2023 Keel and frames assembled

30 November 2023 Keel and frames ready for assembly