Warrior
18 March 2024 Gunport covers and net stretchers added
17 March 2024 Wire for davits bent
17 March 2024 Anchors painted
17 March 2024 Cannons C1 to C4 fitted on main deck
17 March 2024 Cannons C4 after construction
16 March 2024 Cannons C1 added to after deck after construction
15 March 2024 Rudder added. Rear cabin window decoration added with name plate
14 March 2024 Uptakes added aft of funnels and bridges completed and added
13 March 2024 For’ard bridge completed ready for painting
12 March 2024 After gun tracks added. Main belaying pin racks completed
11 March 2024 For’ard gun tracks added. Belaying pin racks & stairs completed
9 March 2024 Gratings painted, glued. Funnels, vents repainted
9 March 2024 Gratings painted, glued. Funnels, vents repainted
7 March 2024 Deckhouses and funnels prepared, fry fitted
5 March 2024 Capstan constructed and fitted. Wheel units constructed
4 March 2024 Ventilator asemblies completed, dry fitted
1 March 2024 White stripe added (glued paper)
29 February 2024 Port side painted black
29 February 2024 Starboard side painted black
28 February 2024 Gunwhale channel painted white
27 February 2024 Gunwhale channel completed over chains
26 February 2024 Chains port and starboard fitted
25 February 2024 Mizzen chains starboard fitted
24 February 2024 Beakhead railings soldered, fitted
23 February 2024 Beakhead and grating completed
23 February 2024 Gunwhale struts added
22 February 2024 Gunwhale tops and ports continued
21 February 2024 Gunwhale lower trims and links added
19 February 2024 Gunwhale tops painted white, lower covers painted black
19 February 2024 Inside of gunwhales painted white
17 February 2024 Figurehead painted
17 February 2024 Deckhouse painted white and other parts painted
17 February 2024 Deckhouse glued, lined, varnished
16 February 2024 Section of deck fittings prepared
16 February 2024 Gunwhale tops prepared
16 February 2024 Belaying pin racks and cat heads fitted
11 February 2024 Gratings varnished
11 February 2024 Chain plated fore, main, mizzen added
7 February 2024 Decking completed
6 February 2024 Decking started
4 February 2024 Parts 120 inserted in decks
3 February 2024 Hull red stripe starboard painted
2 February 2024 Hull red stripe port painted
1 February 2024 Screw painted
1 February 2024 Hull black lower half port painted
31 January 2024 Hull black lower half starboard painted
29 January 2024 Hull sanded, filled, completed, marked for painting
27 January 2024 Hull sanded, filled
24 January 2024 Gunwhales reinforced and tidied
14 January 2024 After end completed
13 January 2024 After end prepared for hull completion
10 January 2024 Starboard side completed
7 January 2024 Starboard side infill below plank 10 begun
6 January 2024 Starboard side planks 5 to 9 added
5 January 2024 Starboard side planks 1 to 4 added
18 December 2023 Starboard side planking begun
17 December 2023 Port side planking completed
16 December 2023 Planks 8 to 14, port side added
14 December 2023 Planks 1 to 7, port side added
11 December 2023 After structure completed. Screw constructed
9 December 2023 After structure added
6 December 2023 Sides sheets completed
3 December Upper side glued
4 December 2023 Upper sides sheets bent
3 December 2023 Main deck glued
1 December 2023 Struts in bow section added
1 December 2023 Small decks added fore and aft
30 November 2023 Keel and frames assembled
30 November 2023 Keel and frames ready for assembly