Line of Battle Ship “Santisima Trinidad” masts and rigging from 20th June 2023

Santisima Trinidad 

25 July 2023 Bowsprit fittings and installation

25 June 2023 Chains completed on starboard side

25 June 2023 Chains completed on port side

23 June 2023 Mizzen mast yards tapered and booms tapered at one end

23 June 2023 Main mast yards tapered

23 June 2023 Fore mast yards tapered

23 June 2023 Bowsprit A frame constructed and glued and yards tapered

22 June 2023 Main, fore and mizzen masts assembled, glued

22 June 2023 Main and fore t’gallant top completed with braces

 

22 June 2023 Mizzen t’gallant top completed with braces

22 June 2023  Mizzen top completed

  

21 June 2023 Mizzen top designed & constructed

21 June 2023 Fore top designed & constructed

21 June 2023 Main top designed & constructed

21 June 2023 Main, fore & mizzen masts prepared

20 June 2023 Bowsprit prepared