Santisima Trinidad
25 July 2023 Bowsprit fittings and installation
25 June 2023 Chains completed on starboard side
25 June 2023 Chains completed on port side
23 June 2023 Mizzen mast yards tapered and booms tapered at one end
23 June 2023 Main mast yards tapered
23 June 2023 Fore mast yards tapered
23 June 2023 Bowsprit A frame constructed and glued and yards tapered
22 June 2023 Main, fore and mizzen masts assembled, glued
22 June 2023 Main and fore t’gallant top completed with braces
22 June 2023 Mizzen t’gallant top completed with braces
22 June 2023 Mizzen top completed
21 June 2023 Mizzen top designed & constructed
21 June 2023 Fore top designed & constructed
21 June 2023 Main top designed & constructed
21 June 2023 Main, fore & mizzen masts prepared
20 June 2023 Bowsprit prepared