Hull construction – frames, planking
24 April 2020 Vertical stern fillers fitted, glued
24 April 2020 Starboard plank 26 cut, tapered at both ends, shaped, glued.
24 April 2020 Starboard plank 25 cut, tapered at both ends, shaped, glued.
23 April 2020 Starboard plank 24 cut, shaped, glued. Filler added aft.
23 April 2020 Starboard plank 23 cut, shaped, glued. Fillers added aft.
23 April 2020 Starboard plank 22 cut, tapered after end, shaped, glued.
23 April 2020 Starboard plank 21 cut, tapered after end, shaped, glued.
23 April 2020 Starboard plank 20 cut, tapered both ends, shaped, glued.
22 April 2020 Starboard plank 19 cut, tapered both ends, shaped, glued.
22 April 2020 Starboard plank 18 cut, tapered both ends, shaped, glued. Filler 7 glued.
22 April 2020 Starboard plank 17 cut, tapered both ends, shaped, glued.
22 April 2020 Starboard plank 16 cut, tapered both ends, shaped, glued.
22 April 2020 Starboard plank 15 cut, shaped, glued.
22 April 2020 Starboard plank 14 cut, shaped, glued. Keeline filler fitted, glued
21-April-2020 Starboard fillers 5, 6 cut, glued. Planks 13, 12, 11, 10 trimmed
21 April 2020 Starboard plank 13 cut, shaped, glued. Vertical filler 4
21 April 2020 Starboard plank 12 cut, shaped, glued. Vertical filler 3
21 April 2020 Starboard plank 11 cut, shaped, glued. Vertical fillers 1, 2
20 April 2020 Starboard plank 10 cut, shaped, glued
20 April 2020 Starboard plank 9 cut, shaped, glued
20 April 2020 Starboard plank 8 cut, shaped, glued
20 April 2020 Starboard plank 7 cut, shaped, glued
19 April 2020 Vertical fillers aft nos 4, 5, and 6, 7 cut and glued. 20 April 2020 Vertical planks trimmed
19 April 2020 Final plank. full length 26 port shaped, tapered, fitted, glued. PORT SIDE COMPLETED
19 April 2020 Full length plank 25 port cut, fitted, glued. Filler 23a glued
19 April 2020 Full length plank 24 port cut, fitted, glued
19 April 2020 Full length plank 23 port cut, fitted, glued
19 April 2020 Full length plank 22 port cut, fitted, glued
18 April 2020 Full length plank 21 port cut, tapered at both ends, fitted, glued
18 April 2020 Short plank 20 port cut, tapered at both ends, fitted, glued
18 April 2020 Short plank 19 port cut, tapered at both ends, fitted, glued
18 April 2020 Short plank 18 port cut, tapered at both ends, fitted, glued
18 April 2020 Short plank 17 port cut, tapered at both ends, fitted, glued
17 April 2020 Plank 16 port cut, tapered at after end, fitted, glued
17 April 2020 Plank 15 port cut, tapered at for’ard end, fitted, glued
17 April 2020 Planks trimmed aft. Port fillers 1, 2 glued. Port filler 3 shped, glued
16 April 2020 Plank 14 port cut, tapered at for’ard end, fitted, glued
16 April 2020 Plank 13 port cut, tapered at for’ard end, fitted, glued
16 April 2020 Plank 12 port cut, fitted, glued
16 April 2020 Plank 11 port cut, fitted, glued
15 April 2020 Plank 10 port cut, fitted, glued
15 April 2020 Plank 9 port cut, fitted, glued
15 April 2020 Plank 8 port cut, fitted, glued
14 April 2020 Plank 7 port cut, fitted, glued
14 April 2020 Forepeak sides and vertical planks trimmed. Aft bevels. Planks reglued
13 April 2020 Forepeak planking (vertical) cut and glued
13 April 2020 Plank starboard for’ard -1 glued
13 April 2020 Inserts for vertical forepart. Plank port -1 glued
13 April 2020 Port and starboard for’ard planks cut, bent, glued, forepeak deck glued
13 April 2020 Starboard planks trimmed aft, main frames trimmed
12 April 2020 Plank 0 aft starboard fitted, glued. Bow completed
12 April 2020 Starboard plank 6 cut, fitted, glued
12 April 2020 Starboard plank 5 cut, fitted, glued
11 April 2020 Starboard plank 4 cut, fitted, glued
11 April 2020 Starboard plank 3 cut, fitted, glued
10 April 2020 Starboard plank 2 cut, fitted, glued
10 April 2020 Starboard plank 1 cut, fitted, glued
10 April 2020 Frames cut to deck level. Bevelling of after section
9 April 2020 Plank 6 port cut, fitted and glued
9 April 2020 Plank 5 reglued for’ard, planks 0 to 5 trimmed aft.
8 April 2020 Plank 5 port cut, fitted, glued
8 April 2020 Plank 4 port cut, fitted, glued
7 April 2020 Plank 3 port cut, fitted, glued
6 April 2020 Plank 0 port aft cut, fitted, glued
6 April 2020 Plank 2 port cut, fitted, glued
5 April 2020 Plank 1 port cut, shaped, fitted, glued
3 April 2020 Main, fore and after decks fitted with foredeck supports
3 April 2020 For’ard struts shaped, glued. Decks dry fitted
31 March 2020 Decks dry fitted
30 March 2020 Hull frames and supports glued
29 March 2020 Edges of after structure and 2 after frames bevelled
29 March 2020 Edges of supports and frames 1 to 3 bevelled
28 March 2020 Dry assembly of hull frames
27 March 2020 Hull frame on building frame base