HMS Endeavour – hull construction from 28 October 2019

Construction of hull from 28 October 2019 

17-Dec-19  Strakes 28 to 31 and filler cut, tapered, fitted, glued 

16-Dec-19  Strakes 25, 26 & 27 cut, tapered, fitted, glued

16-Dec-19  Strakes 23 & 24 cut, tapered, fitted, glued 

15-Dec-19  Strakes 21 & 22 cut, tapered, fitted, glued 

   

15-Dec-19  Strake 20 cut, tapered, fitted, glued 

 

14-Dec-19  Strakes 18 & 19 cut, shaped, fitted, glued 

 

13-Dec-19  After ends of strakes 12 to 17 trimmed and fixed

13-Dec-19  Strakes 16 & 17 fitted but only at stem

12-Dec-19  Strake 15 fitted but only at stem

 

12-Dec-19  Strake 14 fitted fore and aft.

 

12-Dec-19  Strake 13 aft secured to stern strake. Stern strakes fitted  

12-Dec-19   Strake 13 starboard side cut tapering towards the bow, fitted & glued. Strakes 1 & 2 trimmed at well deck. Srakes 1 to 12 trimmed aft.

11-Dec-19  Strake 12 starboard side cut tapering towards the bow, fitted & glued

11-Dec-19  Strake 11 starboard side cut, fitted & glued

11-Dec-19  Strake 6 port side for’ard cut, fitted & glued

11-Dec-19  Strakes 4 & 5 port side for’ard cut, fitted & glued

10-Dec-19  Main deck gunwales reinforced, glued

9-Dec-19  Strake 3 port full length cut, fitted, glued

9-Dec-19  Strakes 1 & 2 port aft cut, fitted, glued

8-Dec-19  Strake 10 cut bent & glued in place.

8-Dec-19  Strakes 7, 8 & 9 cut bent & glued in place.

7-Dec-19  Detail of the bow up to strake 7 with apertures cut and finished

7-Dec-19  6th and 7th strakes, full length cut and glued

7-Dec-19  4th and 5th strakes, full length cut and glued

6-Dec-19  2nd strake aft starboard and 3rd strake full length cut and glued

5-Dec-19  Upper top strake aft fitted, glued

3-Dec-19  Lower section after below catains windows glued

3-Dec-19  Gunwale completed

2-Dec-19  Longboat rough finished

2-Dec-19  Planking cut, fitted and glued on the longboat

1-Dec-19  Starboard side gunwhale completed and fitted

1-Dec-19  Framework of longboat completed

1-Dec-19  Deck ends cut and glued

30-Nov-19  Fore starboard gunwhale shaped, glued

30-Nov-19  After section glued in place with acetate strip behind window sections

27-Nov-19  Quarterdeck fitted

27-Nov-19 Main deck fitted

26-Nov-19 Frames 1 & 2 edges angled

2-Nov-19  Hull assembled with frames 11 to 15 glued, 4 to 10 dry fitted. Spacer 1 glued, spacers 2 & 3 dry fitted. Mainmast dry fitted.

2-Nov-19  Frames 11 to 15 & after structure glued, braced – Mainmast  threaded through spacer 2 (main deck) & lower deck (hole cut) to keel.

2-Nov-19  Hull frames, stretchers and keel dry assembled.

2-Nov-19 Frames 5 to 7 and keel cut and dry fitted.

2-Nov-19 Frames 12 recut (bottom section opened up) and dry fitted.

2-Nov-19 Spacers 1 (modified grating frame with spacers) and 3 cut down

2-Nov-19 Frames 12 to 15 cut and dry fitted.

1-Nov-19  FRAMEs 10 and 11 cut and dry assembled

1-Nov-19  FRAMEs 9 and 8 cut and dry assembled

1-Nov-19 Spacer 2 cut to size with additional positioning supports added

31-Oct-19  FRAME 9 marked out ready for cutting

31-Oct-19  Spacer 3 modified to take full depth mast (to keel), frame for a grating and remove excess depth

31-Oct-19  Spacer 1 modified to take full depth mast (to keel) and remove excess depth

31-Oct-19  Spacer 2 modified to take full depth mast (to keel) and remove excess depth

29-Oct-19  Rib structure dry assembled ready for marking out of interior decks and breaks

28-Oct-19  Keel assembled, sitting in a home made construction jig

28-Oct-19  Keel sections glued together